Emergency Water Extraction
Standing water is pumped and extracted around the clock, before it climbs the walls and soaks the subfloor. Same-day response where coverage allows.
Learn More
Alabama · Florida · Louisiana · Mississippi · South Carolina · See All Locations
My Water Damage and Restoration
At your door, on your schedule - independent water damage restoration pros, nationwide
Around-the-clock response for standing water · Independent local contractors, routed by city
Choose your state, then your city, for extraction, structural drying, storm and groundwater recovery, sewage cleanup, and mold inspection and remediation.
A referral network of independent water damage contractors, reached through one number, in every state.
The order matters more than the equipment. These are the stages the IICRC S500 drying standard describes; each is the contractor's work, and each decides how much of the next there is.
01
The source is shut off, then free water is pumped and extracted. Every hour water stands, it climbs further into drywall and subfloor, so this stage sets the size of everything after it.
02
Baseboard, wet drywall and soaked insulation come out, and meters read the material behind them. The wet edge is marked where the moisture stops, not where the stain does.
03
Air movers and dehumidifiers run as a sealed system, and the same points are read daily. The equipment leaves when the readings reach the dry standard for that material, not on a set day.
04
Rebuild starts only after the structure is confirmed dry. Insulation, drywall and finishes go back over an assembly that will not feed anything later.
Residential and commercial work, available through local pros in every city listed below.
Standing water is pumped and extracted around the clock, before it climbs the walls and soaks the subfloor. Same-day response where coverage allows.
Learn MoreSealed air movers and dehumidifiers bring framing, subfloor and drywall back to a measured dry standard, with daily readings logged from inside the material.
Learn MoreThe opening is closed, the water is extracted, materials floodwater touched come out, and the structure is dried and rebuilt in that order.
Learn MoreBasement seepage, failed sumps and water through the slab are extracted and dried, and the path from the ground is found so the floor stays dry next season.
Learn MoreThe leak is traced above the stain and corrected, wet insulation comes out, the cavity is dried to a reading, and only then is the ceiling repaired.
Learn MoreSewage and black-water losses are contained, the materials the water touched are removed and disposed of, hard surfaces are disinfected, and the space is dried to a reading.
Learn MoreAn independent assessor confirms whether the assembly that got wet is actually dry, whether growth started while it was not, and how far it reaches.
Learn MoreGrowth and the material it grew into come out under containment, what remains is cleaned, and the assembly is dried and read before anything closes it in.
Learn MoreChoose your state, then your city, for extraction, structural drying, storm and groundwater recovery, sewage cleanup, and mold inspection and remediation.
No popular city matches that search — the state grid above covers everywhere else.
Not seeing your state? Coverage is not limited to the cities with their own pages — those exist because the local rules there are worth writing down. Call and you will be routed to the nearest independent contractor either way.
Active losses are answered at any hour, and an independent local contractor is routed to the call as coverage and demand allow. 24/7 for the phone; on-site timing depends on the area.
A drying job done properly ends on a measured dry standard, with daily readings from inside the material, so the structure is dry rather than just the carpet. That is the bar to hold any contractor to, and the guides below say how to ask.
Slab or crawl space, plaster or drywall, block or frame: what has to come out depends on how the houses in your city were built, and a local pro already knows the stock.
Where drying stopped too soon, or was never done, the same call reaches inspection and remediation. It is the tail of a water job, not a separate trade to find.
Say what is wet and for how long. The local contractor who answers can tell you whether it is still a drying job, and get equipment running while it is.
Scoped on site by the contractor who visits - never over the phone.
Say where the water is and what it touched. The call routes to an independent pro covering your area; there is no form to fill and no callback queue.
(833) 243-4415Typically three to five days of equipment run time for drywall and subfloor after clean water, longer for hardwood, plaster or concrete, and longer again in humid weather. The contractor reads the material daily and stops when it reaches a dry standard, not on a fixed day. A number given before anyone has metered the building is a guess.
Sometimes. Drywall wet briefly with clean water, reached within a day, can often be dried in place. Drywall that wicked contaminated water, or stayed wet long enough to soften or swell, is cut out to above the water line. The decision is made with a meter and a look at the back of the sheet, not from the front.
Because the material is wet inside. Water climbs drywall and runs under flooring well past the visible stain, and a meter finds moisture the eye cannot. Cutting to the wet edge, not the stain, is what keeps the job from being reopened a month later.
Not on how it looks. The last of the moisture is bound inside the material and leaves slowest, so surfaces read dry days before the core does. Equipment pulled early is the usual cause of cupped floors, soft walls and later growth. The readings decide.
No. Framing, plywood subfloor, concrete and solid wood usually dry in place. Carpet pad, insulation, particleboard and anything that touched sewage or floodwater leave. Carpet, drywall and hardwood fall in between and depend on the class of water and how long it sat.
It is a groundwater job, and drying the floor is only the first half. The contractor identifies what delivers the water, whether the water table, a failed sump or drainage that no longer drains, because drying without changing the delivery resets the problem for the next wet week.
It is worth a call. The stain is where water left the ceiling, and the cavity above it is usually wetter than it looks, with insulation that has lost its value. Tracing the source, drying the cavity and only then repairing the ceiling is the order that stops the stain from returning.
Growth can begin within about two to three days on a wet, paper-faced or dusty material. That is why extraction and drying start the same day, and why a loss found late, or dried by opening windows, is inspected before it is closed up.
It depends on your area, the time of day and how many losses are active. Many areas see same-day response for standing water when coverage allows. Calling is the fastest way to find out for your city.
No. This is a referral directory. The call routes to an independent restoration contractor who covers your area; that contractor scopes, quotes and does the work under their own terms. The site earns from referrals and is not party to the agreement between you and the contractor.
Restoration contractors ordinarily log moisture readings, photographs, the materials removed and the equipment run time, which is what an adjuster expects. Ask to be copied on the daily readings as they are taken rather than at the end.
Drywall feels dry days before it is. Hardwood cups after it looks fine. A contractor reads moisture inside the material with a pin or non-invasive meter and compares it with a dry sample from an unaffected room in the same house. That comparison, not the surface, says when drying is finished.
Materials that stay wet past a day or two cross from a drying problem into a removal problem. Drywall that could have dried in place is cut out; carpet pad that could have been saved is discarded. Nearly every restoration decision downstream depends on which side of that line the call comes in on.
Framing lumber, plywood subfloor and concrete usually dry in place with enough time and airflow. Drywall dries in place only if it was wet briefly with clean water. Carpet pad, particleboard, insulation and anything that touched contaminated water leave the building. The contractor's scope is largely that list, sorted.
An air mover only lifts moisture off a surface into the air. Without a dehumidifier pulling that moisture out of the room, the air saturates and drying stops, or the water moves into a cooler wall and condenses there. Drying is a closed system: seal the space, move air across the wet surface, dehumidify what comes off it, and read the results.
The same wet floor dries in three days in a dry, warm season and in a week when outdoor air is already saturated. Contractors size dehumidifiers to the room and the season, which is why a job in July on the Gulf coast and a job in October in the high desert are quoted differently for the same square footage.
A supply line delivers clean water; an appliance overflow or a washing-machine drain delivers gray water; sewage, floodwater and anything that has crossed soil deliver black water. The class decides what can be dried and kept. Clean water becomes gray, and gray becomes black, the longer it sits in contact with the building.
A stain marks where water left the ceiling assembly, not where it went in. The cavity above is usually wetter than the stain suggests, and the insulation in it has lost its value once soaked. Tracing the source uphill, drying the cavity, and only then closing it is the sequence that stops the stain from coming back through fresh paint.
A basement that takes water after a wet week, with no storm and no burst pipe, is being fed by the ground: a high water table, a failed sump, a footing drain that no longer drains. Drying the floor without changing what delivers the water resets the job for the next wet week.
Growth needs a wet material and a few days. A loss found late, or a loss that was dried by opening windows, often has it. Inspection confirms whether the assembly is actually dry and whether growth has started; remediation removes what grew and the material it grew into, under containment, before the rebuild closes it in.
Stop the water if it is safe to. Shut off power to the wet rooms. Lift furniture onto blocks or foil. Do not turn on the heat to speed things up, and do not open windows in humid weather. Photograph everything before it moves. Then make the call, because the first day is the one that decides the scope.
Drying is physics with a schedule. Understanding the three variables a contractor controls explains why one job takes three days and another takes ten.
Water leaves a wet material only by evaporating into the air touching it. Air movers keep that air moving so the boundary layer never saturates. Dehumidifiers take the evaporated water out of the room so the air can accept more. Heat helps by raising how much water the air can hold. Drop any one of the three and the other two stall.
A hygrometer in the room tells you about the air. A moisture meter in the framing tells you about the building. Contractors take readings at the same marked points every day and compare them against a dry standard taken from unaffected material in the same house, because what counts as dry for pine in Phoenix is not what counts as dry for pine in Mobile.
The last third of the moisture is the slowest to leave: it is bound inside the material rather than sitting on it. Surfaces look and feel dry while the core is still well above the dry standard. Pulling equipment on appearance is how cupped floors, soft drywall and later growth happen.
Hardwood, plaster, concrete and thick framing hold water deep and release it slowly. A plaster-and-lath wall can take two to three times as long as drywall. Where the timeline is unacceptable, the contractor removes the material instead, which is a decision about time and cost rather than about whether drying would work.
Most of a restoration scope is a sorted list of materials. Knowing the rules makes two quotes comparable.
How porous is it? What class of water touched it? How long was it wet? Non-porous materials clean and stay. Semi-porous materials like framing and plywood usually dry in place. Porous materials depend on the other two answers, and the answers change over the first two days.
Wet drywall is cut out to a height above the visible water line, often in a flood cut at two or four feet so the replacement sheet fits standard sizes. Clean water caught within a day can sometimes be dried in place. Anything that wicked from contaminated water, or held water long enough to soften, comes out.
Carpet often survives; its pad never does. Laminate and engineered floors trap water underneath and usually come up. Solid hardwood can be dried from below with mats if reached early. Tile over a slab hides the problem entirely, and the slab is read with a meter before anyone decides the floor is fine.
Solid wood furniture is lifted and dried. Upholstered pieces that touched gray or black water are discarded. Paper, cardboard and particleboard rarely survive any water at all. A contractor's contents list is part of the scope, and it is written before things are moved, with photographs.
Mold on a water job is usually evidence about the drying, not a separate misfortune. Here is how inspection and remediation fit into the sequence.
Growth needs a wet material, a food source, and roughly two to three days. Paper-faced drywall and dusty framing supply the food. A loss found late, a loss dried by opening windows in summer, or a cavity that was closed while still wet supplies the time. It is the tail end of an unfinished drying job far more often than it is a mystery.
Whether the assembly is actually dry, where growth is if there is any, how far it extends, and what moisture is still feeding it. Readings are taken in materials, cavities are opened where the evidence points, and sampling is used to answer a specific question rather than to confirm that spores exist, which they do everywhere. Nothing in a report of this kind is medical advice.
The area is sealed and put under negative air so disturbed spores stay in it. Material that supported growth comes out; what remains is cleaned and treated. Then the space is dried and re-read before anything is closed up, because remediation over a still-wet assembly puts the same growth back behind new drywall.
How to tell a drying contractor from a cleanup crew, and the questions that make two scopes comparable.
The right answer names a meter, a dry standard from unaffected material, and daily logged readings. An answer about fans and days, without numbers, is a cleaning crew describing a drying job.
A scope should list the materials being removed, the cut heights, the equipment count, the expected run time, and whether rebuild is included. Two scopes that answer those questions the same way can be compared on price. Two that do not cannot.
IICRC certification indicates training against the S500 drying standard; it is not a government license. Some states license restoration under general contracting; others have no restoration-specific credential. Ask which you are being shown, and ask for the license number where one exists.
A price before anyone has seen the water. A plan to dry black-water porous material in place. A rebuild date set before the readings are in. Pressure to sign on the first visit. Any of those is a scope written for the contractor's calendar rather than the building.