After the drying
Mold Inspection & Testing in Boulder, CO
An independent assessor confirms whether the assembly that got wet is actually dry, whether growth started while it was not, and how far it reaches. An inspection after a water loss confirms whether the assembly that got wet is dry now and whether growth started while it was not. Readings are taken in the material, cavities are opened where the readings point, and the result is a written scope of what is dry, what is not, and what has to be corrected for the repair to hold.
Independent local crews · scoped at the property
On this site, inspection is the last check of a water job rather than the start of a separate one. Most people reach this page because something was wet, was dried, and a smell or a stain came back. The inspection answers whether the material is dry now and whether anything grew while it was not. Nothing here is medical advice; questions about health are for a clinician.
Often needed alongside
- Mold Remediation
Growth and the material it grew into come out under containment, what remains is cleaned, and the assembly is dried and read before anything closes it in.
- Structural Drying & Dehumidification
Sealed air movers and dehumidifiers bring framing, subfloor and drywall back to a measured dry standard, with daily readings logged from inside the material.
Frequently asked questions
Why are readings taken at the same time every day?
Because otherwise they cannot be compared. The swing between a cold dawn and a warm afternoon is large enough to move a reading by a meaningful amount without anything actually changing in the wall. Taking them at a fixed hour, in a building held at a stable temperature, is what makes the daily trend mean something.
The surface dries within a day. Is the wall finished?
Almost certainly not. Dry air pulls the face of a material down very quickly and the inside of the cavity follows much more slowly, so the fastest-drying surfaces here are the most misleading. The reading that counts comes from inside the wall through a small opening, and it is taken on consecutive days before anything is closed.
Does a masonry wall run longer than a framed one?
Often twice as long. A framed cavity can be opened at the base and dried with air moving through it in three or four days. Solid masonry has to give its water up through one face at whatever rate the material allows, and there is no way to speed that beyond warming it and keeping the air around it dry.
These questions come from the Boulder page.