Skip to content
My Water Damage and Restoration Scranton logo
Drying equipment coming off a van in front of a house the morning after a storm, tarps still on the roof.

24/7 Emergency

Storm & Flood Damage Recovery in Scranton, PA

The opening is closed, the water is extracted, materials floodwater touched come out, and the structure is dried and rebuilt in that order. The opening is closed first, with tarps or board-up, so the building stops taking on water. Floodwater is extracted, and the porous materials it touched come out rather than dry, since it crossed ground outside. The structure is dried and re-read, and the rebuild waits until the readings and the roof both allow it.

Independent local crews · scoped at the property

Often needed alongside

  • Emergency Water Extraction

    Standing water is pumped and extracted around the clock, before it climbs the walls and soaks the subfloor. Same-day response where coverage allows.

  • Structural Drying & Dehumidification

    Sealed air movers and dehumidifiers bring framing, subfloor and drywall back to a measured dry standard, with daily readings logged from inside the material.

  • Sewage & Contaminated Water Cleanup

    Sewage and black-water losses are contained, the materials the water touched are removed and disposed of, hard surfaces are disinfected, and the space is dried to a reading.

A contractor at the front door with a homeowner after a storm, sorting what can be dried from what has to go.
A contractor setting expectations with the homeowner.

Frequently asked questions

The water came from next door. Why is this side involved?

Because below grade there is only one space. A double block shares a single open cellar with no dividing wall, so a loss under one half is under both. Equipment is placed for the whole cellar rather than for one side of it, and both households are part of the job from the first day.

Half the building is empty and cold. Does that matter?

It matters a great deal. A shared cellar takes its temperature from whatever is above it, so an unheated half keeps the whole space cold and the drying stalls at that end. Temporary heat normally goes into the vacant side, which needs arranging with whoever holds it and is often the slowest part to sort out.

What is read before the floor structure is signed off?

Both ends of the joists, because they span the full width. Framing over the cold or vacant half lags well behind framing over the occupied one even though it is a single floor, so readings are taken at each end rather than in the middle and the slower end sets the finish date.

These questions come from the Scranton page.

Need storm & flood recovery in Scranton now?

Call (833) 243-4415
Call a Local Pro — (833) 243-4415