24/7 Emergency
Storm & Flood Damage Recovery in Dickinson, ND
The opening is closed, the water is extracted, materials floodwater touched come out, and the structure is dried and rebuilt in that order. The opening is closed first, with tarps or board-up, so the building stops taking on water. Floodwater is extracted, and the porous materials it touched come out rather than dry, since it crossed ground outside. The structure is dried and re-read, and the rebuild waits until the readings and the roof both allow it.
Quoted on site by the contractor who visits
Often needed alongside
- Emergency Water Extraction
Standing water is pumped and extracted around the clock, before it climbs the walls and soaks the subfloor. Same-day response where coverage allows.
- Structural Drying & Dehumidification
Sealed air movers and dehumidifiers bring framing, subfloor and drywall back to a measured dry standard, with daily readings logged from inside the material.
- Sewage & Contaminated Water Cleanup
Sewage and black-water losses are contained, the materials the water touched are removed and disposed of, hard surfaces are disinfected, and the space is dried to a reading.
Frequently asked questions
Why is heat the first thing set up rather than extraction?
Because there is nothing to extract yet. In a building that has lost its heating in a January like this the water is ice in the floor and the walls, and a vacuum takes nothing out of that. The building is brought back above freezing first, and the extraction follows as the assembly releases.
Can the extent be assessed while it is frozen?
Only roughly. Ice reads differently from water and much of it is inside the structure where nothing reaches, so an early assessment understates what is there almost every time. The scope is written after the building has warmed and the assemblies have been opened, not on the first visit.
Why is the building warmed slowly?
So that what is released can be dealt with as it arrives. Bringing a frozen building up quickly puts the whole volume into the structure at once with nothing in place to take it, which makes the damage worse than the freezing did. The heat and the extraction are brought up together.