After the drying
Mold Inspection & Testing in Quincy, MA
An independent assessor confirms whether the assembly that got wet is actually dry, whether growth started while it was not, and how far it reaches. An inspection after a water loss confirms whether the assembly that got wet is dry now and whether growth started while it was not. Readings are taken in the material, cavities are opened where the readings point, and the result is a written scope of what is dry, what is not, and what has to be corrected for the repair to hold.
The pro who inspects is the pro who quotes
On this site, inspection is the last check of a water job rather than the start of a separate one. Most people reach this page because something was wet, was dried, and a smell or a stain came back. The inspection answers whether the material is dry now and whether anything grew while it was not. Nothing here is medical advice; questions about health are for a clinician.
Often needed alongside
- Mold Remediation
Growth and the material it grew into come out under containment, what remains is cleaned, and the assembly is dried and read before anything closes it in.
- Structural Drying & Dehumidification
Sealed air movers and dehumidifiers bring framing, subfloor and drywall back to a measured dry standard, with daily readings logged from inside the material.
Frequently asked questions
How close to the surface is the ledge here?
Rock, generally, and not much else. The excavation went down until it met ledge and the slab was poured on top of it, so there is no gravel layer and no soil for water to drain into. The floor sits on solid stone.
Where does the water come from, then?
Along the top of the rock. Water moving down through the soil stops when it reaches ledge and then runs sideways along the surface of it, which can bring it under a floor from a long way off. It is not arriving from directly below.
Why can a sub-slab system not be installed?
Because there is nothing to put one into. A drainage system under a floor needs a layer of stone to work in, and here the slab is on rock. The work goes to the outside of the building and to managing water before it reaches the ledge.
The Quincy overview carries this FAQ with the city research.