24/7 Emergency
Storm & Flood Damage Recovery in Chicago, IL
The opening is closed, the water is extracted, materials floodwater touched come out, and the structure is dried and rebuilt in that order. The opening is closed first, with tarps or board-up, so the building stops taking on water. Floodwater is extracted, and the porous materials it touched come out rather than dry, since it crossed ground outside. The structure is dried and re-read, and the rebuild waits until the readings and the roof both allow it.
Quoted on site by the contractor who visits
Often needed alongside
- Emergency Water Extraction
Standing water is pumped and extracted around the clock, before it climbs the walls and soaks the subfloor. Same-day response where coverage allows.
- Structural Drying & Dehumidification
Sealed air movers and dehumidifiers bring framing, subfloor and drywall back to a measured dry standard, with daily readings logged from inside the material.
- Sewage & Contaminated Water Cleanup
Sewage and black-water losses are contained, the materials the water touched are removed and disposed of, hard surfaces are disinfected, and the space is dried to a reading.
Frequently asked questions
Can the oak floors in a bungalow be dried in place, or do they come up?
Usually in place, if the work starts within a day or two. The contractor lays drying mats over the wet run and pulls air down through the oak and the plank subfloor beneath it, then reads the boards weekly. Cupping flattens as the numbers fall, over two to four weeks. Boards that buckled or lifted at the joints come up; sanding waits until the readings hold.
The garden apartment took sewer water. What happens between the pump-out and the rebuild?
Containment first, because the water is contaminated. Everything porous comes out down to the block: carpet and pad, drywall, insulation, cabinets that stood in it. The slab and the block wall are disinfected, then dried with air movers and a dehumidifier while the base of the wall is read, since block cores hold water long after the floor looks dry. Rebuild starts when the block reads dry twice.
The line split in January and the plaster is open at the base. When can it be closed?
When the readings say so, not the calendar. In the heating season the house air is dry, so lath and framing usually reach the standard within days once the cavity has air moving through it. The brick behind plaster on an exterior wall is the slow part and is read separately. The wall is closed after both hold on two readings a day apart.
These questions come from the Chicago page.