24/7 Emergency
Storm & Flood Damage Recovery in Maxeys, GA
The opening is closed, the water is extracted, materials floodwater touched come out, and the structure is dried and rebuilt in that order. The opening is closed first, with tarps or board-up, so the building stops taking on water. Floodwater is extracted, and the porous materials it touched come out rather than dry, since it crossed ground outside. The structure is dried and re-read, and the rebuild waits until the readings and the roof both allow it.
No obligation: the assessment comes before any scope
Often needed alongside
- Emergency Water Extraction
Standing water is pumped and extracted around the clock, before it climbs the walls and soaks the subfloor. Same-day response where coverage allows.
- Structural Drying & Dehumidification
Sealed air movers and dehumidifiers bring framing, subfloor and drywall back to a measured dry standard, with daily readings logged from inside the material.
- Sewage & Contaminated Water Cleanup
Sewage and black-water losses are contained, the materials the water touched are removed and disposed of, hard surfaces are disinfected, and the space is dried to a reading.
Frequently asked questions
Do lightning systems cause leaks?
The fastenings can. Rods and cable clips are fixed through the covering at intervals along the ridge and down the roof, each one sealed at the time. Thirty years later those seals have gone, and a roof that is otherwise sound has a row of small penetrations along its highest lines.
Should the system be removed?
Not on a rural property in this climate, where the hazard is real. The better answer is having it inspected properly, which covers the fastenings and the grounding together. A system that has been re-roofed around, with cable left loose and connections broken, is not protecting anything anyway.
What should happen when the roof is replaced?
The system comes off and goes back on with new fastenings and new seals, by somebody who works on them. What frequently happens instead is that the roofer works around it, which leaves the old penetrations in place under new covering and the cable no longer properly attached.
These questions come from the Maxeys page.