Growth and the material it grew into come out under containment, what remains is cleaned, and the assembly is dried and read before anything closes it in. The area is sealed and put under negative air, affected porous material comes out, and what remains is cleaned and treated. The assembly is then dried and read to the same standard as any water loss before it is closed, because remediation over a still-wet assembly puts the same growth back behind new drywall.
Quoted on site by the contractor who visits
Remediation here is the tail of a water job: growth is what an unfinished drying leaves behind, and removing it without finishing the drying puts it back. The contractor establishes how far the growth extends and what moisture is still feeding it, removes what grew, and dries and reads the assembly before it is closed. The service note below covers the sequence in this city.
Often needed alongside
- Mold Inspection & Testing
An independent assessor confirms whether the assembly that got wet is actually dry, whether growth started while it was not, and how far it reaches.
- Structural Drying & Dehumidification
Sealed air movers and dehumidifiers bring framing, subfloor and drywall back to a measured dry standard, with daily readings logged from inside the material.
Frequently asked questions
Why is one end of the crawl space still wet?
Because it is not really the same space. The uphill end is cut several feet into the slope with ground pressing against the wall, and it stays at ground temperature with water moving through the soil behind it. The front end is shallow and open by comparison. They are read separately and the deep end sets the schedule.
Can air just be blown in from the accessible side?
Not effectively. Clearance drops to about a foot at the front, so air pushed in from there stalls long before it reaches the deep end. Ducting is run the length of the space, sometimes from a second opening made at the uphill wall, so that the part that actually needs the air is the part that gets it.
Is spring the worst time for this kind of loss?
It is. March is both the wettest month and the point where the slope is carrying the most water from the winter, so the uphill wall is at its worst just as the rain peaks. The same loss in September, with the ground drawn down by the summer, is a straightforward job in half the time.